O'Laughlin Construction
O'Laughlin Construction
  • Home
  • Residential Services
    • Residential Services
    • Kitchen Remodeling
    • Whole Home Renovation
    • Bathroom Remodeling
    • New Construction
    • Load-Bearing Walls
  • Why Choose Us
    • Why Choose Us
    • How We Run a Job
    • Answers
    • Our Process
  • Gallery
  • Contact
  • Meet the Owner
  • More
    • Home
    • Residential Services
      • Residential Services
      • Kitchen Remodeling
      • Whole Home Renovation
      • Bathroom Remodeling
      • New Construction
      • Load-Bearing Walls
    • Why Choose Us
      • Why Choose Us
      • How We Run a Job
      • Answers
      • Our Process
    • Gallery
    • Contact
    • Meet the Owner
  • Home
  • Residential Services
    • Residential Services
    • Kitchen Remodeling
    • Whole Home Renovation
    • Bathroom Remodeling
    • New Construction
    • Load-Bearing Walls
  • Why Choose Us
    • Why Choose Us
    • How We Run a Job
    • Answers
    • Our Process
  • Gallery
  • Contact
  • Meet the Owner

Remodel Costs in Charleston and the Lowcountry

What a Kitchen, Bathroom or Whole-Home Remodel Costs in Charleston and the Lowcountry

O’Laughlin Construction is owned and operated by Andrew O’Laughlin, P.E., a licensed Professional Engineer with more than 25 years of construction industry experience. Our combined engineering and construction expertise allows us to approach renovations with a comprehensive understanding of structural requirements, project feasibility, and construction costs.


Most homeowners want two things before they first call a builder: a realistic sense of what their project may cost, and an understanding of how the work will be run. This page gives both.

Typical project investment

These are general planning ranges, set by Andrew O’Laughlin, P.E. They are not fixed estimates.


Primary bathroom renovation: $35,000 to $70,000+

Secondary bathroom renovation: $25,000 to $40,000+

Kitchen renovation: $60,000 to $150,000+

Major renovation or whole-home remodel: $150,000 to $350,000+


Actual costs depend on the project scope, existing conditions, structural requirements, finishes and permitting.

What moves the number

Scope

What is included, and what could wait. A kitchen that keeps its layout is a different project from one that moves plumbing, opens a wall or adds space.

Existing conditions

What is behind the walls and under the floors: the framing, drain locations, window openings and the condition of the building systems. The more of this that is understood before pricing, the fewer assumptions the estimate has to rely on.

Structural requirements

Removing or relocating a load-bearing wall, adding an opening or changing how loads reach the foundation requires the existing structure to be evaluated, and when required, structural design, calculations and stamped drawings for permitting and construction.

Finishes

Cabinetry, countertops, tile, fixtures and appliances span a wide range, and they are often where a budget is decided.

Permitting

What the work requires from the local permitting office, and how long review takes.

Project complexity and accessibility

Working within an occupied home, restricted access, limited staging areas, or projects requiring specialized subcontractors can influence construction costs and scheduling.

How we develop a reliable estimate

Every successful project begins with a clear understanding of the homeowner’s goals, budget, and expectations.


We begin with an initial consultation to discuss the proposed scope of work, project location, preliminary budget, and anticipated timeline.


If the project appears to be a good fit, we schedule an on-site consultation to evaluate existing conditions, identify potential structural or construction challenges, and determine whether additional design or engineering services may be necessary.


For projects requiring further development, we work with homeowners to establish a clearly defined scope, appropriate plans and specifications, and realistic construction pricing before work begins.


Our goal is to reduce uncertainty, establish clear expectations, and help homeowners make informed decisions throughout the process.


Before construction begins, we establish a project schedule and communication expectations. Throughout construction, homeowners receive regular progress updates, including weekly written updates regarding completed work, upcoming activities, and important project decisions. See how we run a job.

Questions homeowners ask

Why are two bids for the same project so different?

Differences in construction estimates often reflect variations in project scope, material allowances, assumptions, and the level of investigation completed before pricing. Understanding these differences helps homeowners make informed comparisons and reduces the likelihood of unexpected costs during construction.

Why does each range end with a plus sign?

Because some projects go beyond it. Structural changes, higher-end finishes or conditions found during investigation can carry a project past the top of the range. The consultation is where we find out which applies to yours.

What should I do before asking for pricing?

Write down what must be included and what could wait. It makes the first conversation about cost more useful.

What does a preliminary estimate include?

A detailed breakdown of the scope of work, the associated costs and allowances for materials, plus a contingency for unforeseen conditions. Final pricing depends on your material selections, verification of existing conditions and any HOA or permitting requirements.

See the process

See how we run a job: a real schedule and the weekly reports the client received.

See how we run a job

Schedule a consultation

A 30-minute phone call with Andrew.

Schedule a consultation

Copyright © 2026 O'Laughlin Construction - All Rights Reserved.


Powered by

This website uses cookies.

We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

DeclineAccept